How long it takes to build a website
How long it takes to build a website for a small business, week by week, from the first call to launch, and the five things that usually cause delays.

How long does it take to build a website? For a small business, a landing page takes from 10 days, a multi-page business website usually a few weeks, and a large site on a custom CMS up to 30 days, counted from the moment the brief is agreed. The build itself is rarely what takes longest. Waiting for copy approvals, photos, logins and decisions is what stretches projects from weeks into months.
Below is how a typical multi-page website project runs with me, week by week, followed by the things that speed it up and slow it down. Your own project may be shorter or longer, but the order of the steps stays the same.
Before week one: enquiry, call and agreement
Everything starts with a short enquiry and a free 30-minute intro call. On the call, I ask what the business does, who the customers are, which services make the money and what the current site gets wrong. After that I send a proposal: the pages, the features, the price and the deadlines.
Once you approve, there is a written agreement with the scope and dates, and the first payment of 30%. The clock starts when both the agreement and the brief are in place. If you want to speed this stage up, fill in the website brief before the call. It saves a round of questions.
Week 1: audit, structure and access
The first week is about understanding and planning, not designing.
- Audit. I look at your current site (if there is one), your Google Business Profile, your competitors in the same area and the search phrases customers use.
- Sitemap. A list of pages, each with one purpose. For a plumber covering several towns, this is where you and I decide which services and areas deserve their own pages.
- Access. Domain registrar, current hosting, Google Search Console, Google Analytics, any booking or CRM tools. Gathering logins often takes longer than the audit itself.
By the end of the week you have a page plan to approve. Changing the plan at this stage costs nothing. Changing it in week four costs time.
Week 2: copy
Copy comes before design because the words decide the layout. I write from the call and the brief, page by page: the headline, what the service includes, prices or ranges, the process, reasons to trust you and answers to common objections.
You receive the copy to read and approve. This is the step where projects most often stall, because the owner is busy running the business. Setting aside one evening to read and comment on everything at once is the single biggest thing you can do to keep the timeline.
Week 3: design and build
With the copy approved, design moves quickly. I design the key templates (homepage, service page, contact page) with mobile first, then build the site, hand-coded or on a custom CMS made for the project. Forms are connected to your email, WhatsApp or CRM. Tracking is set up in GA4 and Google Tag Manager.
You see the site on a private test address and give feedback. Three rounds of revisions are included across the project, which is usually more than enough when the copy was agreed first.
Week 4: testing, launch and handover
The final week is about making sure nothing goes wrong on launch day:
- Testing on several phones and browsers.
- Checking every form, call button and confirmation message.
- Setting up redirects from old page addresses, so you keep the search visibility you already have.
- Adding the privacy notice and cookie consent, and making sure non-essential cookies wait for consent.
- Connecting the domain and submitting the sitemap to Google Search Console.
After launch, I show you how to use the edit panel, and the final payment of 30% is due. Support and training are included after launch.
A timeline at a glance
| Project | Typical time from agreed brief | Main time sinks |
|---|---|---|
| Landing page | from 10 days | Approving the copy and offer |
| Business website, several pages | a few weeks | Copy approval, photos, logins |
| Website redesign | depends on the content | Redirect map, deciding what to keep |
| Online shop | depends on the catalogue | Product data and photos |
| Large website on a custom CMS | up to 30 days | Content volume, integrations |
Five things that slow a website down
- Copy approval. Two weeks of silence on the copy adds two weeks to the project.
- Photos. If you want real photos of your team and work, book the photographer early or start taking good phone photos now.
- Logins. Domains registered by a former web designer, a forgotten hosting password, a Google account owned by an ex-employee. Start looking for these on day one.
- Too many decision-makers. Three partners each giving feedback separately means three times the revisions. Agree one person who collects and sends feedback.
- Scope creep. "Could we also add a shop?" halfway through is a new project. It can be done, but it changes the dates.
Five things that speed it up
- A completed brief before the first call.
- A list of the services and areas you want to rank for.
- Examples of two or three websites you like, and why.
- Photos, logo files and brand colours in one shared folder.
- Fast replies. I reply within one working day, and projects move fastest when the client does too.
What about time zones?
I work remotely from Poland, which is only one hour ahead of the UK all year, so calls and replies happen during your normal working day. In practice the time difference does not show up in the timeline at all. Deadlines go into the written agreement, and late-delivery penalties can be written in as well.
For the full picture of what a project includes, see web design. If you have a launch date in mind, such as a new branch opening or the start of your busy season, tell me early and I'll plan backwards from it. My business websites page explains what a typical multi-page project includes, and how to write a website brief shows you how to get your part ready before the first call.
You can check fixed prices for each type of project on website pricing, and read more about the whole process in how I work.
Let’s talk
about your business
Before the call I review your website and ads. After the call you get an action plan and a price range in writing.
Timeline
questions
Can you build a website in a week?
A simple landing page can be ready from 10 days, and that is about the fastest a properly written and tracked page can be done. A multi-page business website takes longer, mostly because copy needs writing and approving. Rushing that step usually means launching with weak copy.
When should I start if I need the site for a specific date?
Add at least two weeks to the build time as a buffer for approvals and photos. For a seasonal business, plan to launch in your quiet months, so the site has time to settle before the busy period starts.
What do you need from me during the project?
A brief, access to your domain and accounts, quick answers when questions come up, and approval of the copy. Most delays come from those four things, so having them ready keeps the project on schedule.
Are deadlines written into the contract?
Yes. The agreement lists the scope and the dates, and late-delivery penalties can be written in if you want them. Payment is in three stages, so each stage is tied to visible progress.
Tell me your deadline,
I'll plan backwards
Send a short brief with the date you have in mind. I'll reply within one working day with a timeline and a fixed price, or book a free 30-minute call to talk it through.
